Editing
Data Center Facility/OCP Ready
(section)
Jump to navigation
Jump to search
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Revision History === <!--Insert revisions and updates here. Format: Revision - YYYY/MM/DD - Description--> ==== OCP Colocation Facility Guidelines for Deployment of Open Racks ==== :- V1.0 - 2017/10/17 - First Final for Contribution :- [https://www.opencompute.org/documents/dcf-colocation-facility-guidelines-for-deployment-of-open-compute-project-racks V2.0 - 2017/10/22 - Second Final for OCP Ready™ Program] :- [https://www.opencompute.org/documents/colo-facility-guidelines-for-deployment-of-open-racks-v4-0-pdf V4.0 - 2020/12/15 - Fourth Final for OCP Ready™ Program] :- V4.1[https://146a55aca6f00848c565-a7635525d40ac1c70300198708936b4e.ssl.cf1.rackcdn.com/images/ffbe8e29d12e72084d963989ffec54f11152746d.pdf - 2021/7/12 - Fourth Final revision for OCP Ready™ Program] ==== OCP Ready™ Colo Site Assessment ==== :- V1.0 - 2017/10/05 - First Final for Contribution :- V2.0 - 2018/10/22 - Revised formatting and content. Published. :- V2.1 - 2018/11/27 - Minor revisions. :- V2.2 - 2019/01/17 - Added rolling and concentrated load Acceptable level of 4.5kN. :- V2.3 - 2019/06/18 - Corrected issue in Self Assessment Status rollup for Site 2 and Site 3 assessments. :- V2.4- 2019/02/05 - Added clarification to those requirements that must have an 'Optimum' or 'Acceptable' result and for 'Considerations' information only. Added to Considerations > Efficiency > the 'Site Operations'attribute. :- V2020 - 2020/02/12 - Final for publication :- V2020A - 2020/10/08 - Final for publication :- V2020A V2.5 - 2021/7/1 - Revision to allow for air containment and aisle widths to be selected as 'Not Applicable' due to RDHx deployment :- V2020A V2.6 - 2023/1/17 - Revision to the 'Checklist' worksheet for the revised approval process and minor edits 1) Added 'IT Technical Space' to 'White Space' headings to align with OCP Ready Requirements Matrix -2020A 2) Added note to 'Checklist' worksheet cell B28 & B29 'not required for re-assessment,refers to rows 22-23'
Summary:
Please note that all contributions to OpenCompute may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
OpenCompute:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Navigation menu
Personal tools
Not logged in
Talk
Contributions
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
Edit
View history
More
Search
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Tools
What links here
Related changes
Special pages
Page information