Server/Working: Difference between revisions

From OpenCompute
Jump to navigation Jump to search
Line 36: Line 36:
! License
! License
! Notes
! Notes
|-
| Spec
| OCP Redfish Profile
[http://files.opencompute.org/oc/public.php?service=files&t=6a94d2458bd8ade2fd7d6ac3937c5be4&download OCP_Baseline_Hardware_Mgmt_v0.2.0.pdf] <br>
[http://files.opencompute.org/oc/public.php?service=files&t=aa88253da5dd70d5b5b965584a8943e6&download OCP_Server_Mgmt_Interface_v0.2.0.pdf]
| 0.2.0
| 1/29/18
| Intel
| OWFa1.0
| Scheduled for 2/28 WG meeting <br>
Additional documents on [http://www.opencompute.org/wiki/Hardware_Management/SpecsAndDesigns HW-MGMT Wiki]
|-
| Spec
| Facebook M.2 Carrier card
| 1.0
| 1/29/18
| Facebook
| tbd
| Scheduled for 2/28 WG meeting <br>
|-
| Product
| Quanta M.2 Carrier card based on Facebook spec
| tbd
| 1/29/18
| Quanta
| tbd
| Scheduled for 2/28 WG meeting <br>
|-
|-
| Spec
| Spec
Line 44: Line 71:
| NIC 3.0 Workgroup
| NIC 3.0 Workgroup
| OCPHL-P
| OCPHL-P
| Initial draft presented at 12/20/2017 WG meeting. Final v0.7 spec presented at 1/24/18 WG meeting. Scheduled for 1/25 IC meeting
| Initial draft presented at 12/20/2017 WG meeting. Final v0.7 spec presented at 1/24/18 WG meeting and 1/25 IC meeting
|-
|-
| Spec
| Spec
Line 52: Line 79:
| Facebook
| Facebook
| OCPHL-P
| OCPHL-P
| New spec submission. Presented at 1/24/18 WG meeting. Scheduled for 1/25 IC meeting
| New spec submission. Presented at 1/24/18 WG meeting and 1/25 IC meeting
|-
|-
| Product
| Product
Line 64: Line 91:
| Quanta
| Quanta
| OWFa1.0
| OWFa1.0
| Presented 1/24/18 WG meeting. Scheduled for 1/24 IC meeting
| Presented 1/24/18 WG meeting and 1/25 IC meeting
|-
|-
| Update
| Update
Line 83: Line 110:
| Facebook
| Facebook
| OCPHL-P
| OCPHL-P
| Maintenance update announced at 1/24 WG meeting. The [http://opencompute.org/products/specsanddesign?keyword=big+basin Big Basin marketplace] link will be updated from v0.05 to v1.0.
| Maintenance update announced at 1/24 WG meeting & 1/25 IC meeting. The [http://opencompute.org/products/specsanddesign?keyword=big+basin Big Basin marketplace] link will be updated from v0.05 to v1.0.
|-
|-
| Update
| Update
Line 93: Line 120:
| Facebook
| Facebook
| OCPHL-P 1.0
| OCPHL-P 1.0
| Maintenance update announced at 1/24 WG meeting. The [http://opencompute.org/products/specsanddesign?keyword=twin+lakes Twin Lakes marketplace] link will be updated from v0.4 to 0.97.  V1.0 waiting on official CPU part numbering.
| Maintenance update announced at 1/24 WG meeting & 1/25 IC meeting. The [http://opencompute.org/products/specsanddesign?keyword=twin+lakes Twin Lakes marketplace] link will be updated from v0.4 to 0.97.  V1.0 waiting on official CPU part numbering.
|-
|-
| Update
| Update

Revision as of 21:03, 29 January 2018

OCP Server Design Project

This page lists contributions that are being actively worked by the OCP Server Design Project.

Server Design Project home WIKI

http://www.opencompute.org/wiki/Server

Server Design Project Specs and Designs WIKI

http://opencompute.org/wiki/Server/SpecsAndDesigns


Active Documents and Specs

Project Olympus Subgroup

All Project Olympus discussions and links are in the Project Olympus subgroup WIKI

http://www.opencompute.org/wiki/Server/ProjectOlympus

Toolchain Subgroup

All discussions and links covering tools and processes are in the Toolchain subgroup WIKI

http://www.opencompute.org/wiki/Server/Toolchain

OCP NIC v3.0 (MEZZ) Subgroup

All discussion and links covering OCP Mezzanine NIC are in the Mezz subgroup Wiki

http://www.opencompute.org/wiki/Server/Mezz

Active documents

Type Description Version Submit Date Contributor License Notes
Spec OCP Redfish Profile

OCP_Baseline_Hardware_Mgmt_v0.2.0.pdf
OCP_Server_Mgmt_Interface_v0.2.0.pdf

0.2.0 1/29/18 Intel OWFa1.0 Scheduled for 2/28 WG meeting

Additional documents on HW-MGMT Wiki

Spec Facebook M.2 Carrier card 1.0 1/29/18 Facebook tbd Scheduled for 2/28 WG meeting
Product Quanta M.2 Carrier card based on Facebook spec tbd 1/29/18 Quanta tbd Scheduled for 2/28 WG meeting
Spec NIC v3.0 (MEZZ) subgroup Wiki

OCP_NIC_3.0_draft_0v70_20180123d_TN_no_CB

0.7 1/24/18 NIC 3.0 Workgroup OCPHL-P Initial draft presented at 12/20/2017 WG meeting. Final v0.7 spec presented at 1/24/18 WG meeting and 1/25 IC meeting
Spec Facebook OCP debug card with LCD spec_v1p0 v1.0 1/15/18 Facebook OCPHL-P New spec submission. Presented at 1/24/18 WG meeting and 1/25 IC meeting
Product Quanta Project Olympus US1-EPYC

Project Olympus US1_EPYC Presentation_Deck
Project Olympus US1-EPYC Feature_Summary_0118
Project Olympus US1_EPYC Collateral
Product following the approved Olympus 2S,AMD (EPYC) spec

v1.0 1/19/18 Quanta OWFa1.0 Presented 1/24/18 WG meeting and 1/25 IC meeting
Update Design package to accompany Quanta Yosemite Valley OCP Inspired product

Rackgo X Yosemite Valley Design Package v1 based on the Yosemite R0.5 spec

v1.0 1/18/18 Quanta OCPHL-P Adding Design package existing OCP Inspired product. Presented at 1/24/18 WG meeting. Discussed in 1/24 IC meeting and the product now meets 'OCP Accepted' criteria.
Update Maintenance update to the existing Big Basin specification

Facebook_Big_Basin_JBOG_Spec_v1p0

v1.0 1/15/18 Facebook OCPHL-P Maintenance update announced at 1/24 WG meeting & 1/25 IC meeting. The Big Basin marketplace link will be updated from v0.05 to v1.0.
Update Maintenance update to the existing Twin Lakes Specification

OCP Twin Lakes 1S Server Design Specification rev0.97
OCP Twin Lakes 1S (rev0.97 markup)

v0.97 1/10/18 Facebook OCPHL-P 1.0 Maintenance update announced at 1/24 WG meeting & 1/25 IC meeting. The Twin Lakes marketplace link will be updated from v0.4 to 0.97. V1.0 waiting on official CPU part numbering.
Update Maintenance update to the existing Tioga Pass Specification

Open_Compute_Project_FB_2S_Server_Tioga_Pass_v1p0

v1.0 1/15/18 Facebook OCPHL-P 1.0 Maintenance update announced at 1/24 WG meeting. The Tioga Pass marketplace link will be updated from v0.3 to 1.0. Spec name change verbally approved in 1/25 IC meeting.
Spec Microsoft Project Olympus v1.0 contributions n/a 11/16/17 Microsoft various Many new specs!!
Presented at 11/29/17 workgroup meeting and then to IC vote. Approved specifications are at: Project Olympus
Discussion Open_Compute_Specification_Google_Flatbed_r0p05_20171114
Overview of Flatbed in Open Rack V2.0 (OCP Servers Teleconf 20171129)

for cross workgroup discussion.

v0.05 10/31/17, 11/27/17 Google OWFa1.0 Joint Submissions to Rack and Power Project
For discussion in 11/29 meeting
Spec Xeon Phi OpenRack Motherboard spec

Adams Pass Specifictions Adams Pass Design Package

v1.0 Mar'17 Intel OCPHL-P Need new specification since this design doesn't follow any current spec. Product does not fit in any existing chassis. Need to coordinate chassis submission with motherboard
Preview Qualcom Centriq 2400 OCP motherboard v0.5 v0.5 3/07/17 Qualcomm OWFa 1.0 Preview. Waiting on Project Olympus specs to be submitted and approved

Accepted & Inspired submissions, available in the Marketplace

The most recent documents will always be in the OCP Marketplace, Specifications & Design Collateral

http://opencompute.org/products/specsanddesign

or the OCP Marketplace, Orderable Products

http://opencompute.org/products

Entries below are for ease of use and historical reference. Please use the marketplace links for the most recent documents.

Type Description Version Submit Date Contributor License Notes
Product Rackgo X Big Basin Overview 1.5
QCT Rackgo X Big Basin Contribution v0.2

Big Basin Design Package (zip)
OpenRack V2 GPU JBOG based on the Big Basin spec.

v01 9/20/17 Quanta OWFa1.0 Presented to Server WG 9/27. Presented to the IC on 11/3/17. Accepted on 12/19/17

Marketplace spec link
Marketplace product link

Product SV7220G3 Server Datasheet

SV7220G3 Design Package (zip)
Tioga Pass V4 Design Introduction
OpenRack server following Tioga pass spec

v01 9/5/17 Wiwynn OCP-CLA Presented to OCP IC on 9/21/17. Accepted on 10/19/17

Marketplace spec link
Marketplace product link

Spec OpenRack V2 compliant server

San Jose Motherboard Spec V1.1 San Jose_Design package v0.12

v1.0 5/24/2017, 8/2/17, 8/25/17 Inspur Systems Inc OWFa1.0 Presented to Server WG 6/26.

Presented to OCP IC and Accepted on 8/10
Marketplace spec link
Marketplace product link

Spec Hyve_Solutions_Ambient_Series-E_r8.pdf v1.3 4/18/2017, 9/22/17, 9/26/17 Hyve Solutions OWFa1.0 Presented to ICP IC on 8/10 (Under old guidelines) Accepted 8/22/17

Spec link Marketplace product link

Product Quanta Rackgo X Big Sur contribution file V1.1

Rackgo X Big Sur v1.5.pdf
New BOM Files
Rackgo X Big Sur Design package
OpenRack GPGPU server based on Big Sur spec

v1.0 1/18/16, 7/20/17, 9/22/17 Quanta OWFa 1.0 Presented to Server WG 3/29/17. New spec 7/20

Presented to OCP IC 9/21/17. Accepted on 10/15/17
Marketplace spec link
Marketplace product link

Product PCIe ReTimer Card Datasheet - P16RC.pdf

PCIe ReTimer card Design files July'17 Workgroup presentation deck
Add in card based on PCIE retimer spec

v1.00 7/25/17 Wiwynn OCPHL-P Presented in 7/26 workgroup meeting

Presented in 8/10 IC meeting Accepted by the IC 8/25/2017
Marketplace link

Spec Facebook Retimer Card for PCIe_1.1

Project_Review_Slides_Retimer_Card
LP-PCIE card to Cabled PCIE

v1.1 4/11/17, 6/26/17 Facebook OWFa 1.0 Presented to WG 6/26. IC on 6/27. Accepted by IC vote on 7/17/17 and added to the contribution database

Marketplace Link

Spec Zaius Motherboard & Tray, Barreleye G2 Trays with Zaius Motherboard (OpenPOWER - POWER9)
Chassis, motherboard, rack design, Lunchbox portable power supply designs using 48v Open Rack v2

Zaius_Barreleye_G2_48v_Program Community Preview
Spec v0.5.3 (4.3 MB)
Design Package for Zaius Motherboard/Sled/Deployment Shelf, Barreleye G2 2OU Chassis (618 MB)
Updated Files: 9/12/17
Barreleye G2 - Zaius OCP HW Spec V0.7.0
Barreleye G2 - Zaius 0.7.0 Design Release

v0.6.0 Latest Release: 03/29/2017 Rackspace / Google / IBM OCPHL-P 1.0 Accepted by IC 1/12/17 and added to contribution database

Marketplace Link

Inactive Documents and Specs

Discussion documents, First look specifications, and submissions that were not submitted or approved by the OCP IC (Incubation Committee)

Type Description Version Submit Date Contributor License Notes
Info Redfish Introduction and Overview - OCP Server v1 n/a 8/23/17 n/a FYI Information only

Presented by John Leung in 8/23/17 workgroup meeting

Product Mellanox V2.0 MEZZ cards

Mellanox_25GbE_Card_User_Manual_OCP_rev_1_0.pdf
Mellanox_50GbE_Card_User_Manual_OCP_rev_1_0.pdf
Mellanox_100GbE_Card_User_Manual_OCP_rev_1_0.pdf

v1.0 3/3/2016 Mellanox OWFa 1.0 License info Incorrect. Missing DXF files.

6/27/17 Mellanox is not pursuing certification on these modules. Moving to Inactive.

Product Silicom V2.0 MEZZ cards

Silicom_Quad_Port_SFP+_10G_Mezz_Card_0v4 (Clean).doc Submitted to IC 7/19/16
Silicom_SFP+_10G_Mezz_Card_2v0 presented at 11/18/16 call
Silicom_Single_Port_SFP+_10G_Mezz_Card_0v1.doc
Silicom_Dual_Port_SFP+_10G_Mezz_Card_0v1.doc

v0.1&V0.4 7/19/2016
11/1/2016
Silicom OCPHL-R 1.0 Discussed in 12/8 IC meeting. Upgraded membership to Gold\Silver\Platinum required

5/17/17 No response from Silicom. Moved to inactive

Spec M.2 Carrier Card Design v0.3 Apr 20, 2016 Facebook OWFa 1.0 M.2 Carrier Card Design presented at 2017 Summit.

No official submission.

Spec:Inactive 19" 2U Server System "Carmel" 2U2N

Open_Compute_Project_Carmel_2U2N_V0.5.pdf (1.9MB) 19" 2U Server System "Carmel" 2U4N Open_Compute_Project_Carmel_2U4N_V0.5.pdf (2.0MB)

v0.5 2/3/2016 Wiwynn OWFa 1.0 Inactive. No Base Spec to submit under
Spec:Inactive 19" Rack, 2U 4Node/2Node System "Carmel"

Open_Compute_Project_Carmel_F06S(2U4N)_F06T(2U2N)_System_Specification_V01_20160128_R3.pdf (2.7MB) 19" Rack, 2U, Multi-node system "Monterey" Open_Compute_Project_Carmel_Monterey_F20T_System_Specification_V01_20160128_R3.pdf (2.5MB)

v0.1 2/3/2016 Quanta TBD Inactive. No Base Spec to submit under

Archived Documents and Specs

http://www.opencompute.org/wiki/Server/Archive