| Presented in 2/27 WG call. Introduction to OAM sub-group under Server Project. Future entries will be in the OAP WIki at: https://www.opencompute.org/wiki/Server/OAM | | Presented in 2/27 WG call. Introduction to OAM sub-group under Server Project. Future entries will be in the OAP WIki at: https://www.opencompute.org/wiki/Server/OAM | ||
|- | |- | ||
| Product | | Product | ||
Line 363: | Line 343: | ||
| Presented to IC on 1/10/19 <br> | | Presented to IC on 1/10/19 <br> | ||
Being submitted to HW management group, FYI only for server group <br> [https://www.opencompute.org/documents/ocp-runbmc-daughterboard-card-design-specification-v1-4-1-pdf RunBMC Spec] Approved by IC on 8/14/2019 <br> [https://www.opencompute.org/products/369/runbmc-management-board Hyve RunBMC Mgmt Board] | Being submitted to HW management group, FYI only for server group <br> [https://www.opencompute.org/documents/ocp-runbmc-daughterboard-card-design-specification-v1-4-1-pdf RunBMC Spec] Approved by IC on 8/14/2019 <br> [https://www.opencompute.org/products/369/runbmc-management-board Hyve RunBMC Mgmt Board] | ||
|- | |- | ||
| Specification | | Specification |
Revision as of 17:43, 25 June 2021
OCP Server Design Project
This Wiki covers contributions and topics that are being actively worked by the OCP Server Design Project. (back to the main Server Project Wiki)
The Server Project has various subprojects that focus on more narrow topics. For details on these subprojects see the Wiki's below:
Active Subprojects
- Mezzanine (OCP NIC 3.0) Sub-Project Wiki
- High Performance Computing (HPC) Sub-Project Wiki
- OCP Accelerator Infrastructure (OAI, including OAM) Sub-Project Wiki
- Open Domain-Specific Architecture (ODSA) Sub-Project Wiki
Retired Subprojects
Active Documents and Specs
Documents and information on sub-groups are in the Wiki links above. Documents from the main Server group are below.
Active documents
Type | Description | Version | Submit Date | Contributor | License | Notes |
---|---|---|---|---|---|---|
First Look | General Purpose Enterprise Server Specification Rev 1.0 |
tbd | 5/26/2021 | Inspur, HPE, Supermicro, Flex | tbd | Presented on 6/2 in OCP GP Enterprise Server call |
First Look | Delta Lake 1S Server Design Specification |
tbd | 5/26/2021 | tbd | Presented in 5/26 OCP Monthly server call | |
Specification | SPEC, Yosemite V3 Platform Design, Facebook |
tbd | 5/26/2021 | tbd | Presented in 5/26 OCP Monthly server call Accepted by IC 5/24/2021 | |
First Look | Glacier Point V2 carrier board |
tbd | 4/28/21 | tbd | Presented in 4/28 OCP Monthly server call | |
First Look | Process for Usage Guide and OCP Profile |
tbd | 3/24/21 | Intel | tbd | Presented in 3/23 OCP Monthly server call |
First Look | Usage Guide for theOCP Server HW Mgmt Profile v1.0.0 |
tbd | 3/24/21 | Intel | tbd | Presented in 3/23 OCP Monthly server call |
Specification | JunctionCity OCP Submittal Proposal20210215.pptx |
tbd | 2/15/2020 | Intel & Wiwynn | tbd | For discussion in Feb'21 WG call |
Specification | Yosemite-V3 Platform for Single Socket Server_ServerProject_010821 |
1.0 | 1/21/2020 | OCPHL-P | Presented in Jan'21 WG call | |
Specification | Delta Lake 1S Server Design Specification 1v00.pdf DeltaLake_ServerProject_Presentation.pptx |
1.0 | 1/21/2021 | OCPHL-P | Presented in Jan'21 WG call | |
Specification | Inspur Crane Mountain refresh20210127.pptx |
0.1 |
1/25/2021 |
Inspur | tbd | Presented in Jan'21 WG call |
Specification | AMD based 1S Tioga Pass server specification
MiTAC Capri _Open-Compute-Specification v1 (official 1.0).pdf |
1.0 |
1/25/2021 1/29/2021 |
Mitac | OCP CLA | Presented in Jan'21 WG call |
Specification | OCP DC-SCM spec Rev 0.95_release_to_OCP_IC.pdf |
0.95 0.8 |
12/02/2020 11/10/2020 |
Microsoft & Google | OWFa 1.0 CLA | Reviewed in November Server & HW-MGMT calls Presented to the IC and accepted on 1/8/2021 |
Specification | M.2 Accelerator Module Hardware Specification 1.0 draft Dual M.2 Accelerator Module Hardware Specification 1.0 draft |
1.0 | 8/19/2020 | OCP-CLA | Presented in 8/26/20 WG call Accepted by IC on 10/16/20 | |
Pathfinding | Modularization_scoping_community_communication_Q1'20_v1.pptx | v1 | 3/25/2020 | Jia Ning | n/a | Presented in 3/25/20 WG call |
Status | OCPServerOAIBuilding on DC-SCM to support OAI_v02 | n/a | 2/26/2020 | OAI Subgroup | n/a | Presented in 2/25/20 WG call |
First Look | Small JBOG Solution deck |
0.1 | 2/25/2020 | ITRenew | TBD | Presented in 2/25/20 WG call |
Specification | Sonora Pass server WG presentation - rev1p0 |
0.5 | 1/22/2020 | OCPHL-P | Presented in 1/2/20 WG call | |
Presentation | Isolated control plane intro-2020-01-20 |
n/a | 1/21/2020 | HPE | n/a | Presented in 1/2/20 WG call |
Specification | M.2 Accelerator Module Hardware Specification 0.2 |
0.2 | 12/13/19 | OCPHL-P | Presented in 1/2/20 WG call | |
Specification | Dual M.2 Accelerator Module Hardware Specification 0.2 |
0.2 | 12/13/19 | OCPHL-P | Presented in 1/2/20 WG call | |
Product | QCT Rackgo X MiniLake for OCP R1 QCT Rackgo X MiniLake_Design_Package_1023 Following the SPEC, Minilake ComE, Facebook base spec |
R1 | 10/23/19 | Quanta | OWFa1.0 | Presented in 10/23/19 WG call MiniLake Spec in Contribution DB |
Spec | OCP OAI Universal Baseboard Design Specification v0.4 from OAI sub-project |
0.4 | 10/23/19 | OAI sub-project | OWFa1.0 | Presented in 10/23/19 WG call Approved by IC on 2/7/2020 OAI UBB Spec in Contribution DB |
Spec | Minilake COMe compute module spec v1.6 Following the PICMG COM express base spec |
v1.6 | 7/18/19 | OWFa1.0 | Presented in 7/24/19 WG call MiniLake Spec in Contribution DB | |
Product | Netronome 50G OCP Mezzanine Card v1p3 Netronome 50G Crypto OCP Mezzanine Card v1p3 |
1.3 | 7/18/19 | Netronome | OWFCL1.0 | Presented in 7/24/19 WG call |
Spec | Inspur Whistler 3U 4x Socket Olympus Server Summit Update-0725 Inspur 3OU 4-Socket Olympus Server Whistler Mother Board Spec V0.1 Inspur 3OU 4-Socket Olympus Server Whistler System Design Spec V0.1 |
0.1 | 7/18/19 | Inspur | OCP-CLA | Presented in 7/24/19 WG call. Approved by the IC 8/12/19 Whistler System Design Spec Whistler Motherboard Spec Both in Contribution DB Whistler Server on Marketplace |
Spec | OCP 3U Olympus Intel GPU Server Spec v1.0 OCP 3U Olympus AMD GPU Server Spec v1.0 |
1.0 | 1/23/19, 7/18/19 | ZT-systems/AMD | OCP-CLA | Presented in 1/23 WG call. Intel spec approved by the IC 7/1/19 |
Spec | 3U Server Intel Open-Compute-Specification -190608.pdf OCP Crane Mountain (NF8260M5) Sales kit 1.5 |
0.1 | 4/23/19 | Inspur | OCP-CLA | Presented in 4/24 WG call & 6/21/19 IC meeting |
First Look | Datacenter-ready Secure Control Module and Interface_3_15_2019 Deck from Summit Forum talk |
0.1 | 3/20/19 | Microsoft | OCPHL-P | Discussed in 3/27 WG call. Looking for feedback and interest level. If there is enough interest we may create a subproject. Please use the mailing list or contact Siamak Tavallaei <sitaval@microsoft.com> |
Specification | M.2 Accelerator Module Hardware Specification 0.1 |
0.1 | 3/20/19 | OCPHL-P | Presented in 3/27 WG call | |
Specification | Dual M.2 Accelerator Module Hardware Specification 0.1 |
0.1 | 3/20/19 | OCPHL-P | Presented in 3/27 WG call | |
Specification | GPv2_OCP_contribution_FB_03282019 Glacier Point V2 Design Specification v0.1 |
0.1 | 3/20/19 | OCPHL-P | Presented in 3/27 WG call Update 3/9/2020 per Hao, GPv2 card is in PVT stage now. We plan to update the spec directly to 1.0 and contributed to OCP as part of our Accelerator platform. | |
Introduction | OCP Accelerator Module 022719.pptx | n/a | 2/27/19 | Facebook& MSFT | n/a | Presented in 2/27 WG call. Introduction to OAM sub-group under Server Project. Future entries will be in the OAP WIki at: https://www.opencompute.org/wiki/Server/OAM |
Product | E7278P OCP-MotherBoard-SpecificationV0_1 Very similar to Tioga Pass v1.0 spec |
0.1 | 1/21/19 | Mitac | OWFa1.0 | Presented in 1/23/19 WG call. Discussed in 3/27 WG call. Tioga Pass spec has been updated to v1.1 to allow this MB to comply with it. |
Product | Relion Phi X1030e motherboard |
1.0 | 1/21/19 | Penguin | OCPHL-P | Presented in 1/23 WG call. Similar to Tioga Pass but it's UP Zeon Phi, vs. DP Sky Lake so it will need it's own base spec. |
Specification | OCP_runBMC_ Daughterboard_Card_Design_Specification_v1.0pdf |
1.0 | 1/10/19 | Salesforce/Dropbox | OWFa1.0 | Presented to IC on 1/10/19 Being submitted to HW management group, FYI only for server group |
Specification | Decathlete v3 Specification_rev1.0 | 1.0 | 9/26/18 10/11/18 | Quanta | OWFa1.0 | Presented in 9/26 workgroup call. Spec posted 10/11/18. Discussed generalizing spec to allow multi-vendor products in 11/28 call |
Product | QuantaGrid D52B-1U for OCP Deck QuantaGrid D52B-1U product spec (Files pending) |
tbd | 9/26/18 | Quanta | tbd | Presented in 9/26 workgroup call. On hold. Dependent on Decathlete V3 spec. approval. |
Design Pkg | Wiwynn OCP debug card Presentation Debug Card Design Package |
1.0 | 2/27/18 | Wiwynn | OCPHL-P | Presented in 2/28 WG meeting and 7/12 IC meeting. Changed to Design package only. No spec received |
Accepted & Inspired submissions, available in the Marketplace
The most recent documents will always be in the OCP Marketplace, Specifications & Design Collateral
or the OCP Marketplace, Orderable Products
Entries below are for ease of use and historical reference. Please use the marketplace links for the most recent documents.
Type | Description | Version | Submit Date | Contributor | License | Notes |
---|---|---|---|---|---|---|
Design Package | Design Contribution of QCT Rackgo X Leopard Cave for OCP v1.1 QCT Rackgo X Leopard Cave Product Marketing Specification_v1 |
1.0 | 3/20/19, 4/3/19 | Quanta | OWFa 1.0 | Presented in 3/27 WG call & 5/2 IC call. Approved 5/17/19 |
Spec | Open_Compute_Project_FB_2S_Server_Tioga_Pass_v1p1 Minor updates to Tioga Pass V1.0->V1.1 |
1.1 | 4/23/19 | OCPHL-R | Announced in 4/23 WG call. Minor changes to existing v1.0 spec. | |
Spec | NIC v3.0 (MEZZ) subgroup Wiki OCP_NIC_3.0_draft_0v80_20180604a_TN (old) |
v0.8 | 1/24/18 6/7/18 | NIC 3.0 Workgroup | OCPHL-P | Initial draft presented at 12/20/2017 WG meeting. v0.7 draft presented at 1/24/18 WG meeting and 1/25 IC meeting. Approved by the OCP IC 7/3/18 |
Spec | Telco enhanced OpenRack V2 Server Open_Rack-server-OCP-contribution-v1.0.pdf Nokia open edge server brief for OCP project calls v06 (old) |
1.0 | 10/2, 12/17/18 | Nokia | OCPHL-P | Presented in 8/22/18 Server WG meeting. Accepted by OCP IC 12/10/18 |
Product + Design Pkg |
QCT Rackgo X OCP AVA-4 M.2 Carrier Card for OCP Presentation R1_1 QCT Rackgo X OCP AVA-4 M.2 Carrier Card Product Marketing Specification_R1_1 |
1.1 | 6/19, 7/6/18, 10/18/18 | Quanta | OWFa1.0 | Presented in 4/25 Server WG meeting and 7/12 IC meeting. New v1.1 docs 10/18. Accepted by OCP-IC 11/20/2018 |
Product + Design Pkg |
QCT Rackgo X OCP Debug Card with LCD for OCP Presentation R1_1 QQCT Rackgo X OCP Debug Card with LCD Product Marketing Specification_R1_1 |
1.1 | 6/19, 7/6/18, 10/18/18 | Quanta | OWFa1.0 | Presented in 4/25 Server WG meeting and 7/12 IC meeting. New v1.1 docs 10/18. Accepted by OCP-IC 11/20/2018 |
Product + Design Pkg |
QCT Rackgo X Tioga Pass for OCP Presentation R1_1 QCT Rackgo X Tioga Pass Product Marketing Specification_R1_1 |
1.1 | 2/27, 6/19, 7/6/18, 10/18/18 | Quanta | OWFa1.0 | Presented in 4/25 Server WG meeting and 7/12 IC meeting. New v1.1 docs 10/18. Accepted by OCP-IC 11/20/2018 |
Product + Design Pkg |
Presentation of QCT Rackgo X Yosemite V2 R1_1 QCT Rackgo X Yosemite V2 Product Marketing Specification_R1_1 |
1.0 | 8/22/18 10/11/18 | Quanta | OWFa1.0 | Presenting on 8/22 WG call. New v1.1 docs and IC presentation 10/11. Accepted by OCP-IC 11/20/2018 |
Product | Presentation- OCP 25G dual port Mezzanine Card 1008_final Mitac OCP 25G dual port Mezzanine Card Specification v1.0 |
1.0 | 9/13/18, 10/8/18 | Mitac | OWFa1.0 | Presented in 9/26 workgroup call. Accepted by the IC 10/26/18. |
Design Package | Design package to accompany Quanta Yosemite Valley OCP Inspired product
Rackgo X Yosemite Valley Design Package v1
based on the Yosemite R0.5 spec |
v1.0 | 1/18/18 | Quanta | OCPHL-P | Adding Design package existing OCP Inspired product. Presented at 1/24/18 WG meeting. Discussed in 1/24 IC meeting. No vote necessary |
Design Package | Quanta Project Olympus US1-EPYC Project Olympus US1_EPYC Brief_Specification |
v1.0 | 1/19/18 | Quanta | OWFa1.0 | Presented 1/24/18 WG meeting and 1/25 IC meeting. Approved on 4/18/18 |
Spec | Facebook_OCP_Debug_Card_with_LCD_Spec_v1p0 | v1.0 | 1/15/18 | OCPHL-P | New spec submission. Presented at 1/24/18 WG meeting and 1/25 IC meeting. Accepted by OCP-IC 2/9/2018 | |
Update | Maintenance update to the existing Big Basin JBOG specification |
v1.0 | 1/15/18 | OCPHL-P | Maintenance update to v1.0 presented at 1/24 WG meeting & 1/25 IC meeting. Accepted. | |
Update | Maintenance update to the existing Twin Lakes Specification OCP Twin Lakes 1S Server Design Specification rev1.00 |
v0.97 | 1/10/18 | OCPHL-P 1.0 | Maintenance update v0.4 to v1.0 presented at 1/24 WG meeting & 1/25 IC meeting. Accepted. | |
Update | Maintenance update to the existing Tioga Pass Specification |
v1.0 | 1/15/18 | OCPHL-P 1.0 | Maintenance update v0.3 to v1.0 presented at 1/24 WG meeting & 1/25 IC meeting. Spec name change verbally approved in 1/25 IC meeting. | |
Spec | Microsoft Project Olympus v1.0 contributions | n/a | 11/16/17 | Microsoft | various | Many new specs!! Presented at 11/29/17 workgroup meeting and then to IC vote. Approved specifications are at: Project Olympus |
Discussion | Open_Compute_Specification_Google_Flatbed_r0p05_20171114 Overview of Flatbed in Open Rack V2.0 (OCP Servers Teleconf 20171129) for cross workgroup discussion. |
v0.05 | 10/31/17, 11/27/17 | OWFa1.0 | Joint Submissions to Rack and Power Project For discussion in 11/29 meeting. Submitted by Rack and Power. approved 1/12/18 | |
Spec | OCP M.2 Carrier V1.0 Updates |
1.0 | 2/14/18 | Facebook & MSFT | OWFa1.0 | New spec submission. (Concept presented in 2016 Summit was not submitted) Presented in 2/28 WG meeting and 4/15 IC Meeting. Approved 4/30/2018 |
Product | Rackgo X Big Basin Overview 1.5 QCT Rackgo X Big Basin Contribution v0.2 Big Basin Design Package (zip) |
v01 | 9/20/17 | Quanta | OWFa1.0 | Presented to Server WG 9/27. Presented to the IC on 11/3/17. Accepted on 12/19/17 |
Product | SV7220G3 Server Datasheet SV7220G3 Design Package
(zip) |
v01 | 9/5/17 | Wiwynn | OCP-CLA | Presented to OCP IC on 9/21/17. Accepted on 10/19/17 |
Spec | OpenRack V2 compliant server San Jose Motherboard Spec V1.1 San Jose_Design package v0.12 |
v1.0 | 5/24/2017, 8/2/17, 8/25/17 | Inspur Systems Inc | OWFa1.0 | Presented to Server WG 6/26.
Presented to OCP IC and Accepted on 8/10 |
Spec | Hyve_Solutions_Ambient_Series-E_r8.pdf | v1.3 | 4/18/2017, 9/22/17, 9/26/17 | Hyve Solutions | OWFa1.0 | Presented to ICP IC on 8/10 (Under old guidelines) Accepted 8/22/17 |
Product | Quanta Rackgo X Big Sur contribution file V1.1 Rackgo X Big Sur v1.5.pdf |
v1.0 | 1/18/16, 7/20/17, 9/22/17 | Quanta | OWFa 1.0 | Presented to Server WG 3/29/17. New spec 7/20 Presented to OCP IC 9/21/17. Accepted on 10/15/17 |
Product | PCIe ReTimer Card Datasheet - P16RC.pdf
PCIe ReTimer card Design files
July'17 Workgroup presentation deck |
v1.00 | 7/25/17 | Wiwynn | OCPHL-P | Presented in 7/26 workgroup meeting
Presented in 8/10 IC meeting
Accepted by the IC 8/25/2017 |
Spec | Facebook Retimer Card for PCIe_1.1 Project_Review_Slides_Retimer_Card |
v1.1 | 4/11/17, 6/26/17 | OWFa 1.0 | Presented to WG 6/26. IC on 6/27. Accepted by IC vote on 7/17/17 and added to the contribution database | |
Spec | Zaius Motherboard & Tray, Barreleye G2 Trays with Zaius Motherboard (OpenPOWER - POWER9) Chassis, motherboard, rack design, Lunchbox portable power supply designs using 48v Open Rack v2 Zaius_Barreleye_G2_48v_Program Community Preview |
v0.6.0 | Latest Release: 03/29/2017 | Rackspace / Google / IBM | OCPHL-P 1.0 | Accepted by IC 1/12/17 and added to contribution database |
Inactive Documents and Specs
Discussion documents, First look specifications, and submissions that were not submitted or approved by the OCP IC (Incubation Committee)
Type | Description | Version | Submit Date | Contributor | License | Notes |
---|