Networking/SpecsAndDesigns: Difference between revisions
Jump to navigation
Jump to search
Line 148: | Line 148: | ||
** [https://docs.google.com/document/d/1oco9xcIJ8rqZ1Kk6mNrEKjupCXh7r5B6iHHwAIbfTMs Dec 02] [http://files.opencompute.org/oc/public.php?service=files&t=913330c5e38e968fffa7b1b27601be54 6-layer Stack] | ** [https://docs.google.com/document/d/1oco9xcIJ8rqZ1Kk6mNrEKjupCXh7r5B6iHHwAIbfTMs Dec 02] [http://files.opencompute.org/oc/public.php?service=files&t=913330c5e38e968fffa7b1b27601be54 6-layer Stack] | ||
** [https://docs.google.com/document/d/1EXPlZ_vRANetv84fztnohRWY0g4Mvlpa3Isa3gxRLg8 Dec 09] [http://files.opencompute.org/oc/public.php?service=files&t=4664e8ed900bb4ceb182679c17dd3e99 ONL(P) Overview] [http://files.opencompute.org/oc/public.php?service=files&t=946100028a43e3d1fa65d2bda00f37c2 SFP Interrupt Diagram] | ** [https://docs.google.com/document/d/1EXPlZ_vRANetv84fztnohRWY0g4Mvlpa3Isa3gxRLg8 Dec 09] [http://files.opencompute.org/oc/public.php?service=files&t=4664e8ed900bb4ceb182679c17dd3e99 ONL(P) Overview] [http://files.opencompute.org/oc/public.php?service=files&t=946100028a43e3d1fa65d2bda00f37c2 SFP Interrupt Diagram] | ||
** [https://docs.google.com/document/d/1nBIrD0gnEOqSAa4xD4hXqIQ2w6dXNL58FmZq1zMGuM0 Dec 16] [http://files.opencompute.org/oc/public.php?service=files&t=9c142e40e024e89b6c1491aee5fb1763 Draft Spec] | ** [https://docs.google.com/document/d/1nBIrD0gnEOqSAa4xD4hXqIQ2w6dXNL58FmZq1zMGuM0 Dec 16] [http://files.opencompute.org/oc/public.php?service=files&t=9c142e40e024e89b6c1491aee5fb1763 Draft Spec 0.3] | ||
** [https://docs.google.com/document/d/1xD99S_4Cz6lB5ECVLID3yEImIOT9zUHuaWRcY_cSdP0 Jan 13] | ** [https://docs.google.com/document/d/1xD99S_4Cz6lB5ECVLID3yEImIOT9zUHuaWRcY_cSdP0 Jan 13] [http://files.opencompute.org/oc/public.php?service=files&t=3b7e6909e59654fdcebdf25bef28b484 Updated Draft Spec 0.4] | ||
= Old Specs = | = Old Specs = | ||
[[Networking/SpecsAndDesigns/Old|Specs that are no longer active are located here.]] | [[Networking/SpecsAndDesigns/Old|Specs that are no longer active are located here.]] |
Revision as of 17:44, 13 January 2016
Note that the specs below are at different stages of submission/approval
Hardware Specs
Accepted Hardware
Accton AS5712-54X - Leaf Switch
- Specification, design package - Accepted Oct 2014
- License: OCPHL - Permissive
- Contact: Jeff Catlin
Accton ORSA-1RU - Open Rack Switch Adapter
- Specification, design package - Accepted Mar 2015
- License: OCPHL - Reciprocal
- Contact: Jeff Catlin
Alpha Networks - SNX-60x0-486F - 48-port 10G SFP+ & 6-port 40G QSFP Switch
- Specification, design package - Accepted July 2015
- License: OCPHL - Permissive
- Contact: Robert Chu
Alpha Networks - SNQ-60x0-320F - 32-port 40Gb QSFP TOR/Aggregation Switch
- Specification, design package- Accepted July 2015
- License: OCPHL - Permissive
- Contact: Robert Chu
Mellanox MSX1410OCP - SwitchX-2 48 SFP+ & 12 QSFP+
- Specification, design package - Accepted Oct 2015
- License - OCPHL - Reciprocal
- Contact: Michael Rivers, Amir Sheffer
Mellanox MSX1710OCP - SwitchX-2 36 QSFP+
- Specification, design package - Accepted Oct 2015
- License - OCPHL - Reciprocal
- Contact: Michael Rivers, Amir Sheffer
Facebook Wedge
- Specification, package - Accepted Nov 2015
- License - OCPHL - Reciprocal
- Contact: Hans-Juergen Schmidtke/Omar Baldonado (Facebook), Jeff Catlin (Accton), Edge-core
PLEASE NOTE THESE HAVE BEEN SHARED WITH THE COMMUNITY AND ARE STILL UNDER REVIEW BUT NOT YET ACCEPTED BY THE IC
Accton - 32x40G, 32x100G - based on Broadcom silicon
- Latest version/spec: spec for 32x40G, spec for 32x100G
- Spec status: community review - April 13, 2015
- Contact: Jeff Catlin
Accton - 32x100G - based on Cavium silicon
- Latest version/spec: v.02
- Spec status: Shared - Oct 9, 2015
- Contact: Jeff Catlin
Inventec DCS6072QS
- Latest version/spec: v1.02, May 2015
- License - OCPHL - P
- 48x10GB SFP+, 6x40GB QSFP+
- Spec status: Shared
- Switch availability: now
- Contact: Alex Johnstone
Inventec DCS7032Q28
- Latest version/spec: v1.02, May 2015
- License - OCPHL - P
- 32x100GB QSFP28
- Spec status: Submitted
- Switch availability: now
- Contact: Alex Johnstone
Broadcom/Interface Masters Open 1.0 Leaf and Spine Switch specification
- Latest version/spec: v1.0, October 2013
- Spec status: Shared, Last review by Incubation Committee, July 2014, awaiting final license determination by Broadcom
- Orderability: now
- Contact: Eli Karpilovski (Broadcom), Ben Askarinam (Interface Masters)
Software Specs
Accepted Software
Open Network Install Environment
- Cumulus Networks, ONIE Proposed charter, v0.2, July 2013
- Latest ONIE info is at http://onie.org
- Spec status: Final and accepted - 2014
- ONIE Information Section
- License: GPLv2
- Contact: Curt Brune
Open Network Linux
- Big Switch Networks, ONL software spec, v0.9, Nov 2014
- Latest ONL info is at http://opennetlinux.org/
- ONL Information Section
- Spec status: Final and accepted - Jan 2015
- License: EPLv1
- Contact: Rob Sherwood and Jeff Townsend
Switch Abstraction Interface
- Microsoft, Dell, Facebook, Broadcom, Intel, Mellanox Current Spec v2
- Spec status: Final and accepted - July 2015
- License: Apache v2
- Contact: Kamala Subramaniam
- Earlier versions: 2014-10-06 , April 2015 v1
PLEASE NOTE THESE HAVE BEEN SHARED WITH THE COMMUNITY AND ARE STILL UNDER REVIEW BUT NOT YET ACCEPTED BY THE IC
ACPI Platform Description
- Cumulus Networks, APD software spec, v0.1, April 2015
- Discussed at OCP Summit 2015
- Spec status: Shared
- License: Kernel pieces (GPLv2), Userland docs/build: MIT
- Contact: Dustin Byford
OpenNSL
- Broadcom, OpenNSL software spec, v0.14, November 2015
- Mentioned at OCP Eng Workshop Boston 2015 Discussed at [TBD]
- Spec status: Shared, To Be Discussed
- License: Apache v2
- Contact: Ashok Raman
Testing Activities
Pluggable Transceiver and Host Compliance and Interopability Test Plan
This is in conjunction with the UNH Interoperability Lab and their Open Networking Test Services
- Integrator's List
- Test Configs
- Integrator's List Policy Latest
- Rev 24, Current working draft
- Rev 20 Latest, Used for Interop Program 2015-09
- 2015-06 Used in 2015-06 Dry Run
- 2015-02 Used in 2015-02 Dry Run
- Program Launched: 2015 September 21
- Contact: David Woolf, UNH-IOL
Various Projects
Common Module Interface
- Original presentation from UNH Eng Workshop
- Kickoff document from Nov 09
- Meeting Minutes