Networking/ONIE: Difference between revisions

From OpenCompute
Jump to navigation Jump to search
(Created page with "In progess")
 
No edit summary
Line 1: Line 1:
In progess
This page contains information pertaining to testing and certification of ONIE.
 
== Testing ==
The current ONIE Specification and Testing document is located:
* draft r5
* test report
'''These documents are based on the upcoming 2014-08 release.'''
 
== Certification - WORK IN PROGRESS ==
Prior to submitting a network device for ONIE certification, the following items '''must''' be performed:
* ONIE image for the device is openly available on the vendor's website
* ONIE source code for the device is openly available
** preferably in the main ONIE repository on [https://github.com/onie/onie/ GitHub]
* Ensure all other requirements are met as described in the testing document (i.e. asset tracking labels)
 
The certification process for ONIE will be as follows:
* Submit network device to ONIE certification lab
** '''NOTE: device is not returnable as this device will be used for all future ONIE certifications (on vendor's request)'''
* Once the device has been received, testing will begin no later than 5 business days
* Normal testing results should be available no later than 5 business days after testing has begun
** Test results will be sent directly to vendor and OCP C&I Director (only if device passed)
* OCP Foundation will issue certification voucher to vendor upon verification
* Vendor is now able to use ONIE Certified logo on website and marketing collateral
 
== FAQ ==

Revision as of 20:23, 25 June 2014

This page contains information pertaining to testing and certification of ONIE.

Testing

The current ONIE Specification and Testing document is located:

  • draft r5
  • test report

These documents are based on the upcoming 2014-08 release.

Certification - WORK IN PROGRESS

Prior to submitting a network device for ONIE certification, the following items must be performed:

  • ONIE image for the device is openly available on the vendor's website
  • ONIE source code for the device is openly available
    • preferably in the main ONIE repository on GitHub
  • Ensure all other requirements are met as described in the testing document (i.e. asset tracking labels)

The certification process for ONIE will be as follows:

  • Submit network device to ONIE certification lab
    • NOTE: device is not returnable as this device will be used for all future ONIE certifications (on vendor's request)
  • Once the device has been received, testing will begin no later than 5 business days
  • Normal testing results should be available no later than 5 business days after testing has begun
    • Test results will be sent directly to vendor and OCP C&I Director (only if device passed)
  • OCP Foundation will issue certification voucher to vendor upon verification
  • Vendor is now able to use ONIE Certified logo on website and marketing collateral

FAQ