Server/Working
OCP Server Design Project
This page lists contributions that are being actively worked by the OCP Server Design Project.
Link to Server Design Project home WIKI http://www.opencompute.org/wiki/Server
Link to Server Design Project Specs and Designs WIKI http://opencompute.org/wiki/Server/SpecsAndDesigns
Active Documents and Specs
Project Olympus Subgroup
All Project Olympus discussions and links are in the Project Olympus subgroup WIKI at http://www.opencompute.org/wiki/Server/ProjectOlympus
Toolchain Subgroup
All discussions and links covering tools and processes are in the Toolchain subgroup WIKI at http://www.opencompute.org/wiki/Server/Toolchain
OCP MEZZ NIC Subgroup
All discussion and links covering OCP Mezzanine NIC are in the Mezz subgroup Wiki at http://www.opencompute.org/wiki/Server/Mezz
Active documents
Type | Description | Version | Submit Date | Contributor | License | Notes |
---|---|---|---|---|---|---|
Spec | NIC v3.0 (MEZZ) subgroup Wiki |
0.7 | 1/24/18 | NIC 3.0 Workgroup | OCPHL-P | Initial draft presented at 12/20/2017 WG meeting. Final v0.7 spec scheduled for 1/24/18 WG meeting and 1/25 IC meeting |
Spec | Facebook OCP debug card with LCD spec_v1p0 | v1.0 | 1/15/18 | OCPHL-P | New spec submission for discussion in 1/24/18 WG meeting | |
Product | Quanta Project Olympus US1-EPYC Project Olympus US1-EPYC_Feature_Summary_0118 |
v1.0 | 1/19/18 | Quanta | OWFa1.0 | To present at 1/24/18 WG meeting. |
Update | Design package to accompany Quanta Yosemite Valley OCP Inspired product
Rackgo X Yosemite Valley Design Package v1
based on the Yosemite R0.5 spec |
v1.0 | 1/18/18 | Quanta | OCPHL-P | Additional collateral to add to existing OCP Inspired product submission. To present at 1/24/18 WG meeting. |
Update | Maintenance update to the existing Big Basin specification |
v1.0 | 1/15/18 | OCPHL-P | Maintenance update, recommend to update the Big Basin marketplace link from v0.05 to v1.0 after community review in the 1/24/18 WG meeting | |
Update | Maintenance update to the existing Twin Lakes Specification OCP Twin Lakes 1S Server Design Specification rev0.97 |
v0.97 | 1/10/18 | OCPHL-P 1.0 | Maintenance update, recommend to update the Twin Lakes marketplace link from v0.4 to 0.97 after community review in the 1/24/18 WG meeting | |
Update | Maintenance update to the existing Tioga Pass Specification |
v1.0 | 1/15/18 | OCPHL-P 1.0 | Maintenance update, recommend to update the Tioga Pass marketplace link from v0.3 to 1.0 after community review in the 1/24/18 WG meeting | |
Spec | Microsoft Project Olympus v1.0 contributions | n/a | 11/16/17 | Microsoft | various | Many new specs!! Presented at 11/29/17 workgroup meeting and then to IC vote. Approved specifications are at: Project Olympus |
Discussion | Open_Compute_Specification_Google_Flatbed_r0p05_20171114 Overview of Flatbed in Open Rack V2.0 (OCP Servers Teleconf 20171129) for cross workgroup discussion. |
v0.05 | 10/31/17, 11/27/17 | OWFa1.0 | Joint Submissions to Rack and Power Project For discussion in 11/29 meeting | |
Spec | Xeon Phi OpenRack Motherboard spec | v1.0 | Mar'17 | Intel | OCPHL-P | Need new specification since this design doesn't follow any current spec. Product does not fit in any existing chassis. Need to coordinate chassis submission with motherboard |
Preview | Qualcom Centriq 2400 OCP motherboard v0.5 | v0.5 | 3/07/17 | Qualcomm | OWFa 1.0 | Preview. Waiting on Project Olympus specs to be submitted and approved |
Accepted submissions, available in the Marketplace
The most recent documents will always be in the specifications & design collateral database at:
http://opencompute.org/products/specsanddesign
or search the OCP marketplace database at:
http://opencompute.org/products
Entries below are for ease of use and historical reference. Please use the marketplace links for the most recent documents.
Type | Description | Version | Submit Date | Contributor | License | Notes |
---|---|---|---|---|---|---|
Product | Rackgo X Big Basin Overview 1.5 QCT Rackgo X Big Basin Contribution v0.2 Big Basin Design Package (zip) |
v01 | 9/20/17 | Quanta | OWFa1.0 | Presented to Server WG 9/27. Presented to the IC on 11/3/17. Accepted on 12/19/17 |
Product | SV7220G3 Server Datasheet SV7220G3 Design Package
(zip) |
v01 | 9/5/17 | Wiwynn | OCP-CLA | Presented to OCP IC on 9/21/17. Accepted on 10/19/17 |
Spec | OpenRack V2 compliant server San Jose Motherboard Spec V1.1 San Jose_Design package v0.12 |
v1.0 | 5/24/2017, 8/2/17, 8/25/17 | Inspur Systems Inc | OWFa1.0 | Presented to Server WG 6/26.
Presented to OCP IC and Accepted on 8/10 |
Spec | Hyve_Solutions_Ambient_Series-E_r8.pdf | v1.3 | 4/18/2017, 9/22/17, 9/26/17 | Hyve Solutions | OWFa1.0 | Presented to ICP IC on 8/10 (Under old guidelines) Accepted 8/22/17 |
Product | Quanta Rackgo X Big Sur contribution file V1.1 Rackgo X Big Sur v1.5.pdf |
v1.0 | 1/18/16, 7/20/17, 9/22/17 | Quanta | OWFa 1.0 | Presented to Server WG 3/29/17. New spec 7/20 Presented to OCP IC 9/21/17. Accepted on 10/15/17 |
Product | PCIe ReTimer Card Datasheet - P16RC.pdf
PCIe ReTimer card Design files
July'17 Workgroup presentation deck |
v1.00 | 7/25/17 | Wiwynn | OCPHL-P | Presented in 7/26 workgroup meeting
Presented in 8/10 IC meeting
Accepted by the IC 8/25/2017 |
Spec | Facebook Retimer Card for PCIe_1.1 Project_Review_Slides_Retimer_Card |
v1.1 | 4/11/17, 6/26/17 | OWFa 1.0 | Presented to WG 6/26. IC on 6/27. Accepted by IC vote on 7/17/17 and added to the contribution database | |
Spec | Zaius Motherboard & Tray, Barreleye G2 Trays with Zaius Motherboard (OpenPOWER - POWER9) Chassis, motherboard, rack design, Lunchbox portable power supply designs using 48v Open Rack v2 Zaius_Barreleye_G2_48v_Program Community Preview |
v0.6.0 | Latest Release: 03/29/2017 | Rackspace / Google / IBM | OCPHL-P 1.0 | Accepted by IC 1/12/17 and added to contribution database |
Inactive Documents and Specs
Discussion documents, First look specifications, and submissions that were not submitted or approved by the OCP IC (Incubation Committee)
Type | Description | Version | Submit Date | Contributor | License | Notes |
---|---|---|---|---|---|---|
Info | Redfish Introduction and Overview - OCP Server v1 | n/a | 8/23/17 | n/a | FYI | Information only Presented by John Leung in 8/23/17 workgroup meeting |
Product | Mellanox V2.0 MEZZ cards
Mellanox_25GbE_Card_User_Manual_OCP_rev_1_0.pdf |
v1.0 | 3/3/2016 | Mellanox | OWFa 1.0 | License info Incorrect. Missing DXF files. 6/27/17 Mellanox is not pursuing certification on these modules. Moving to Inactive. |
Product | Silicom V2.0 MEZZ cards
Silicom_Quad_Port_SFP+_10G_Mezz_Card_0v4 (Clean).doc Submitted to IC 7/19/16 |
v0.1&V0.4 | 7/19/2016 11/1/2016 |
Silicom | OCPHL-R 1.0 | Discussed in 12/8 IC meeting. Upgraded membership to Gold\Silver\Platinum required 5/17/17 No response from Silicom. Moved to inactive |
Spec | M.2 Carrier Card Design | v0.3 | Apr 20, 2016 | OWFa 1.0 | M.2 Carrier Card Design presented at 2017 Summit. No official submission. | |
Spec:Inactive | 19" 2U Server System "Carmel" 2U2N
Open_Compute_Project_Carmel_2U2N_V0.5.pdf (1.9MB) 19" 2U Server System "Carmel" 2U4N Open_Compute_Project_Carmel_2U4N_V0.5.pdf (2.0MB) |
v0.5 | 2/3/2016 | Wiwynn | OWFa 1.0 | Inactive. No Base Spec to submit under |
Spec:Inactive | 19" Rack, 2U 4Node/2Node System "Carmel"
Open_Compute_Project_Carmel_F06S(2U4N)_F06T(2U2N)_System_Specification_V01_20160128_R3.pdf (2.7MB) 19" Rack, 2U, Multi-node system "Monterey" Open_Compute_Project_Carmel_Monterey_F20T_System_Specification_V01_20160128_R3.pdf (2.5MB) |
v0.1 | 2/3/2016 | Quanta | TBD | Inactive. No Base Spec to submit under |