Server/Working
OCP Server Design Project
This page lists contributions that are being actively worked by the OCP Server Design Project.
Server Design Project home WIKI
Server Design Project Specs and Designs WIKI
Active Documents and Specs
Project Olympus Subgroup
All Project Olympus discussions and links are in the Project Olympus subgroup WIKI
Toolchain Subgroup
All discussions and links covering tools and processes are in the Toolchain subgroup WIKI
OCP NIC v3.0 (MEZZ) Subgroup
All discussion and links covering OCP Mezzanine NIC are in the Mezz subgroup Wiki
Active documents
Type | Description | Version | Submit Date | Contributor | License | Notes |
---|---|---|---|---|---|---|
Spec | OCP Redfish Profile
OCP_Baseline_Hardware_Mgmt_v0.2.0 |
0.2.0 | 1/29/18 | Intel | OWFa1.0 | Presented in 2/28 WG meeting and 3/8 combined with HW management group Additional documents on HW-MGMT Wiki |
Spec | OCP M.2 Carrier V1.0 Updates |
1.0 | 2/14/18 | Facebook & MSFT | OWFa1.0 | New spec submission. (Concept presented in 2016 Summit was not submitted) Presented in 2/28 WG meeting. On April IC Agenda |
Preview | Preview of Summit presentation. Salesforce RunBMC OCP Presentation |
tbd | 2/27/18 | Salesforce | tbd | Presented at 2/28 WG meeting. Discussed in 3/8 IC meeting and it was decided that it will shift from Server to HW management workgroup. Specification & design files pending |
Product+ Design Pkg |
Wiwynn OCP debug card Presentation Wiwynn OCP debug card Spec (TBD) |
1.0 | 2/27/18 | Wiwynn | OCPHL-P | Presented in 2/28 WG meeting. Tentative for April IC meeting. |
Product + Design Pkg |
Quanta Tioga Pass Product following the Tioga pass Spec spec |
tbd | 2/27/18 | Quanta | OWFa1.0 | Pushed to March'18 meeting per Quanta request |
Spec | NIC v3.0 (MEZZ) subgroup Wiki |
v0.7 | 1/24/18 | NIC 3.0 Workgroup | OCPHL-P | Initial draft presented at 12/20/2017 WG meeting. Final v0.7 spec presented at 1/24/18 WG meeting and 1/25 IC meeting. Under review |
Spec | Facebook_OCP_Debug_Card_with_LCD_Spec_v1p0 | v1.0 | 1/15/18 | OCPHL-P | New spec submission. Presented at 1/24/18 WG meeting and 1/25 IC meeting. Accepted by OCP-IC 2/9/2018 | |
Product | Quanta Project Olympus US1-EPYC Project Olympus US1_EPYC Brief_Specification |
v1.0 | 1/19/18 | Quanta | OWFa1.0 | Presented 1/24/18 WG meeting and 1/25 IC meeting. Under review |
Design package | Design package to accompany Quanta Yosemite Valley OCP Inspired product
Rackgo X Yosemite Valley Design Package v1
based on the Yosemite R0.5 spec |
v1.0 | 1/18/18 | Quanta | OCPHL-P | Adding Design package existing OCP Inspired product. Presented at 1/24/18 WG meeting. Discussed in 1/24 IC meeting. |
Update | Maintenance update to the existing Big Basin specification |
v1.0 | 1/15/18 | OCPHL-P | Maintenance update announced at 1/24 WG meeting & 1/25 IC meeting. The Big Basin marketplace link will be updated from v0.05 to v1.0. | |
Update | Maintenance update to the existing Twin Lakes Specification OCP Twin Lakes 1S Server Design Specification rev1.00 |
v0.97 | 1/10/18 | OCPHL-P 1.0 | Maintenance update announced at 1/24 WG meeting & 1/25 IC meeting. The Twin Lakes marketplace link will be updated from v0.4 to 0.97. V1.0 added 2/28/18 | |
Update | Maintenance update to the existing Tioga Pass Specification |
v1.0 | 1/15/18 | OCPHL-P 1.0 | Maintenance update announced at 1/24 WG meeting. The Tioga Pass marketplace link will be updated from v0.3 to 1.0. Spec name change verbally approved in 1/25 IC meeting. | |
Spec | Microsoft Project Olympus v1.0 contributions | n/a | 11/16/17 | Microsoft | various | Many new specs!! Presented at 11/29/17 workgroup meeting and then to IC vote. Approved specifications are at: Project Olympus |
Discussion | Open_Compute_Specification_Google_Flatbed_r0p05_20171114 Overview of Flatbed in Open Rack V2.0 (OCP Servers Teleconf 20171129) for cross workgroup discussion. |
v0.05 | 10/31/17, 11/27/17 | OWFa1.0 | Joint Submissions to Rack and Power Project For discussion in 11/29 meeting | |
Spec | Xeon Phi OpenRack Motherboard spec | v1.0 | Mar'17 | Intel | OCPHL-P | Need new specification since this design doesn't follow any current spec. Product does not fit in any existing chassis. Need to coordinate chassis submission with motherboard |
Preview | Qualcom Centriq 2400 OCP motherboard v0.5 | v0.5 | 3/07/17 | Qualcomm | OWFa 1.0 | Preview. Waiting on Project Olympus specs to be submitted and approved |
Accepted & Inspired submissions, available in the Marketplace
The most recent documents will always be in the OCP Marketplace, Specifications & Design Collateral
or the OCP Marketplace, Orderable Products
Entries below are for ease of use and historical reference. Please use the marketplace links for the most recent documents.
Type | Description | Version | Submit Date | Contributor | License | Notes |
---|---|---|---|---|---|---|
Product | Rackgo X Big Basin Overview 1.5 QCT Rackgo X Big Basin Contribution v0.2 Big Basin Design Package (zip) |
v01 | 9/20/17 | Quanta | OWFa1.0 | Presented to Server WG 9/27. Presented to the IC on 11/3/17. Accepted on 12/19/17 |
Product | SV7220G3 Server Datasheet SV7220G3 Design Package
(zip) |
v01 | 9/5/17 | Wiwynn | OCP-CLA | Presented to OCP IC on 9/21/17. Accepted on 10/19/17 |
Spec | OpenRack V2 compliant server San Jose Motherboard Spec V1.1 San Jose_Design package v0.12 |
v1.0 | 5/24/2017, 8/2/17, 8/25/17 | Inspur Systems Inc | OWFa1.0 | Presented to Server WG 6/26.
Presented to OCP IC and Accepted on 8/10 |
Spec | Hyve_Solutions_Ambient_Series-E_r8.pdf | v1.3 | 4/18/2017, 9/22/17, 9/26/17 | Hyve Solutions | OWFa1.0 | Presented to ICP IC on 8/10 (Under old guidelines) Accepted 8/22/17 |
Product | Quanta Rackgo X Big Sur contribution file V1.1 Rackgo X Big Sur v1.5.pdf |
v1.0 | 1/18/16, 7/20/17, 9/22/17 | Quanta | OWFa 1.0 | Presented to Server WG 3/29/17. New spec 7/20 Presented to OCP IC 9/21/17. Accepted on 10/15/17 |
Product | PCIe ReTimer Card Datasheet - P16RC.pdf
PCIe ReTimer card Design files
July'17 Workgroup presentation deck |
v1.00 | 7/25/17 | Wiwynn | OCPHL-P | Presented in 7/26 workgroup meeting
Presented in 8/10 IC meeting
Accepted by the IC 8/25/2017 |
Spec | Facebook Retimer Card for PCIe_1.1 Project_Review_Slides_Retimer_Card |
v1.1 | 4/11/17, 6/26/17 | OWFa 1.0 | Presented to WG 6/26. IC on 6/27. Accepted by IC vote on 7/17/17 and added to the contribution database | |
Spec | Zaius Motherboard & Tray, Barreleye G2 Trays with Zaius Motherboard (OpenPOWER - POWER9) Chassis, motherboard, rack design, Lunchbox portable power supply designs using 48v Open Rack v2 Zaius_Barreleye_G2_48v_Program Community Preview |
v0.6.0 | Latest Release: 03/29/2017 | Rackspace / Google / IBM | OCPHL-P 1.0 | Accepted by IC 1/12/17 and added to contribution database |
Inactive Documents and Specs
Discussion documents, First look specifications, and submissions that were not submitted or approved by the OCP IC (Incubation Committee)
Type | Description | Version | Submit Date | Contributor | License | Notes |
---|---|---|---|---|---|---|
Info | Redfish Introduction and Overview - OCP Server v1 | n/a | 8/23/17 | n/a | FYI | Information only Presented by John Leung in 8/23/17 workgroup meeting |
Product | Mellanox V2.0 MEZZ cards
Mellanox_25GbE_Card_User_Manual_OCP_rev_1_0.pdf |
v1.0 | 3/3/2016 | Mellanox | OWFa 1.0 | License info Incorrect. Missing DXF files. 6/27/17 Mellanox is not pursuing certification on these modules. Moving to Inactive. |
Product | Silicom V2.0 MEZZ cards
Silicom_Quad_Port_SFP+_10G_Mezz_Card_0v4 (Clean).doc Submitted to IC 7/19/16 |
v0.1&V0.4 | 7/19/2016 11/1/2016 |
Silicom | OCPHL-R 1.0 | Discussed in 12/8 IC meeting. Upgraded membership to Gold\Silver\Platinum required 5/17/17 No response from Silicom. Moved to inactive |
Spec | M.2 Carrier Card Design | v0.3 | Apr 20, 2016 | OWFa 1.0 | M.2 Carrier Card Design presented at 2017 Summit. No official submission. | |
Spec:Inactive | 19" 2U Server System "Carmel" 2U2N
Open_Compute_Project_Carmel_2U2N_V0.5.pdf (1.9MB) 19" 2U Server System "Carmel" 2U4N Open_Compute_Project_Carmel_2U4N_V0.5.pdf (2.0MB) |
v0.5 | 2/3/2016 | Wiwynn | OWFa 1.0 | Inactive. No Base Spec to submit under |
Spec:Inactive | 19" Rack, 2U 4Node/2Node System "Carmel"
Open_Compute_Project_Carmel_F06S(2U4N)_F06T(2U2N)_System_Specification_V01_20160128_R3.pdf (2.7MB) 19" Rack, 2U, Multi-node system "Monterey" Open_Compute_Project_Carmel_Monterey_F20T_System_Specification_V01_20160128_R3.pdf (2.5MB) |
v0.1 | 2/3/2016 | Quanta | TBD | Inactive. No Base Spec to submit under |